Core Valleys reconstruction

The contemporary Railway scene in Wales.
Post Reply
User avatar
dwrathan
Posts: 43
Joined: Thu Mar 06, 2014 8:31 pm
Location: Deganwy, Sir Gaernarfon

Core Valleys reconstruction

Post by dwrathan »

Last week I travelled to Merthyr and Aberdare to see the new works. The double lines through Quakers Yard; between Pentrebach and Merthyr; between Mountain Ash and Fernhill; and between Cwmbach and Aberdare are now all in use with new signals.

Does anyone have the commissioning date of the Core Valley Lines Integrated Control Centre and the closing date of Abercynon signal box

I have found, on www.railengineer.co.uk/cardiff-area-resignalling, a note that Heath Junction, Ystrad Mynach and Bargoed signal boxes (not on the CVL) were closed in June 2013. Is this correct ?

Dwrathan.
User avatar
dwrathan
Posts: 43
Joined: Thu Mar 06, 2014 8:31 pm
Location: Deganwy, Sir Gaernarfon

Re: Core Valleys reconstruction

Post by dwrathan »

I've just seen in Nation.Cymru that there are now wires to Aberdare and Merthyr. Presumably they are energized, probably for test running, or perhaps to prevent theft.

https://nation.cymru/news/transport-for ... milestone/
User avatar
dwrathan
Posts: 43
Joined: Thu Mar 06, 2014 8:31 pm
Location: Deganwy, Sir Gaernarfon

Re: Core Valleys reconstruction

Post by dwrathan »

dwrathan wrote: Mon Jul 31, 2023 5:06 pm Last week I travelled to Merthyr and Aberdare to see the new works. The double lines through Quakers Yard; between Pentrebach and Merthyr; between Mountain Ash and Fernhill; and between Cwmbach and Aberdare are now all in use with new signals.

Does anyone have the commissioning date of the Core Valley Lines Integrated Control Centre and the closing date of Abercynon signal box

I have found, on www.railengineer.co.uk/cardiff-area-resignalling, a note that Heath Junction, Ystrad Mynach and Bargoed signal boxes (not on the CVL) were closed in June 2013. Is this correct ?

Dwrathan.
I can now answer my own questions.
Radyr and Abercynon signal boxes were closed on 2 May 2023, replaced by Core Valley Lines Integrated Control Centre.
Heath Junction, Ystrad Mynach and Bargoed signal boxes were closed on 6 September 2013, replaced by WROC.

I got these dates from www.railcodes.org.uk
Post Reply