I don't think these views will be available for very much longer.
Apologies for the quality - they are frames taken from a video shot with a compact camera and then cropped to remove most of the reflections in the window.
Guess where!
-
andrewnummelin
- Posts: 209
- Joined: Tue Dec 17, 2013 9:06 pm
Guess where!
You do not have the required permissions to view the files attached to this post.
Regards,
Andrew Nummelin
Andrew Nummelin
- dwrathan
- Posts: 44
- Joined: Thu Mar 06, 2014 8:31 pm
- Location: Deganwy, Sir Gaernarfon
Re: Guess where!
Is this Park Jn ?
-
andrewnummelin
- Posts: 209
- Joined: Tue Dec 17, 2013 9:06 pm
Re: Guess where!
Indeed. Taken from trains between Ebbw Vale and Newport yesterday - nice to have trip on a normal train using a route that hasn't seen regular passenger services in decades. I needed to go to Newport anyway so thought I'd take the opportunity of using a route I'd never been on before - everything went very smoothly except for the ticketing - I was sold a ticket to Cardiff as that was cheaper than the one to Newport.dwrathan wrote:Is this Park Jn ?
A couple of extra photos of scenes that may not exist for long.
You do not have the required permissions to view the files attached to this post.
Regards,
Andrew Nummelin
Andrew Nummelin
-
Mike87f
- Posts: 18
- Joined: Fri Dec 20, 2013 2:59 pm
Re: Guess where!
The reason for ticketing is that the normal journey to Newport would be via Cardiff, longer so more expensive. Arriva Wales were selling Cardiff tickets as if the journey was a direct one that didn't require a change at Newport.
Normally there would be no space in the busy main line timetable to park the Ebbw Vale train at Platform 4. This was possible during the engineering works by rearranging the timetable. In particular Cardiff to Holyhead trains only ran between Shrewsbury to Holyhead. Passengers had to use the Manchester train for the southern part of that journey.
Normally there would be no space in the busy main line timetable to park the Ebbw Vale train at Platform 4. This was possible during the engineering works by rearranging the timetable. In particular Cardiff to Holyhead trains only ran between Shrewsbury to Holyhead. Passengers had to use the Manchester train for the southern part of that journey.
-
Mike87f
- Posts: 18
- Joined: Fri Dec 20, 2013 2:59 pm