Hi All,
I'm a bit confused about what the apparent platform marks are about in the original post. Apologies this is a longer post than intended.
I don't have a copy of the GWR maps book mentioned above - could someone clarify what is shown please? (I appreciate that there will be copyright on the book, but a general idea of whether this is the same as the National Library of Scotland 1890-1914 layer would be helpful.)
I looked at the National Library of Scotland maps in side to side views for different periods.
The only one in which the platform appears seems to be in the period 1892-1914 for the OS 25in map. Links below show this period in the Left window with the right window for the same location being either:
1/ The OS 6in map 1830-1880 where the platform is absent. See below
https://maps.nls.uk/geo/explore/side-by ... &right=257
2/ The OS 1:1250 / 1:2500 for 1944-1975, again the platform is absent (as it appears to be for all layers except the 1892-1914 one). Link below:
https://maps.nls.uk/geo/explore/side-by ... &right=173
Not sure if this is a scaling thing (i.e. smaller scales than 25in do not have sufficient detail to show the platforms), or if this is reflective of the period when the platform existed. Perhaps someone with the GWR map book referenced could let me know if it shows something different?
There is both a Llanbradach station (1500) and a Llanbradach Colliery Halt (1501) on the Rhymney Railway listed in my copy of: "
Great Western Stations 1947 A Photographic & Track Diagram Survey PART Two (Numbers 721=1612) The Wirral, Welsh Borders and Wales", by R.J. Smith.
There are platforms at Llanbradach Colliery Halt which is stated as Closed to Workmen's Trains by June 1954. Llanbradach Colliery was closed in 1961 by the NCB.
I have not been able to find a halt on the B&MR in the original query in my copy of the RJ Smith book. This halt is the other side of the valley from the RR and the Colliery. (Albeit the name of the station is not obvious on the map, so I can't use the index easily.)
I note that the M&BR and Barry Railway (BR) had a junction called Barry Junction just to the south of the B&MR Halt. There are what appear to be associated sidings at Dyffryn Isaf. The Barry railway junction was I think opened in January 1905, so fits the period where it is shown on the NLS maps.
Given the above I am left wondering if the platforms shown on the OS 25in Map layer for the period 1892-1914, are primarily for a halt to help facilitate the construction of the new junction? The use of the platform for worker trains to Llanbradach Colliery might not have been viable given the already existing RR Llanbradach Colliery Halt.
Hope the links work as had some trouble copy these, and my ramblings make some sense.
Any thoughts or information would be most welcome.
Many thanks,
Regards,
Joe